Call (808) 521-4513

ATFP Design

Building 9 Renovation, Pearl Harbor Navy Shipyard & Intermediate Maintenance Facility (MACC)

Building 9 is occupied by the Nuclear Engineering and Planning Department. The facility is a historic Category II (ICRMP 2002) concrete structure originally built in the year 1913 and extended in 1918. This three-story building was retrofitted for a seismic and wind upgrade and progressive collapse features, including Anti-Terrorism/Force Protection (AT/FP).

WORK WITH US

CALL (808) 521-4513

ADDRESS
1001 Bishop Street,
Suite 2950, Honolulu,
HI 96813